R & D

In the light of the studies carried out in the past period, researches and development works continue with various methods in order to reveal reserves.
In 1976, the MTA conducted site drilling and geophysical surveys (MTA, 1976).
In 2013 and afterwards, MEYRA started the R&D works by taking surface samples.
Between 2014 and 2017, drilling works started and cuts started to be opened in order to verify the data of drilling and geophysical works carried out in the past years and ore detections were carried out. In 2018, a drilling program was made in compliance with the JORC code, carrying these studies to international standards. As a result of this program, MEYRA plans to reveal a mineral deposit geometry with the potential of millions of tonnes in line with its objectives.

Firma Tarihçesi